Marrowstone / Documentation / Maintenance plans

Maintenance plans

A plan joins an interval, a checklist, and a relative due span into one reusable record pattern.

Attach a plan to a device when the same work repeats. The register then shows the next service as a span, so a printed page stays clear when it is read later.

Plan patterns
PlanIntervalChecklistRegister display
Visual checkEvery 7 daysDaily surroundingsin 4 days
Filter careEvery 30 daysAir handlingin 12 days
Calibration reviewEvery 90 daysInstrument checkin 38 days
Safety inspectionEvery 180 daysCabinet and hoodin 61 days
P-01

Relative due spans

Write the next service as in 4 days or in 12 days. This keeps examples useful no matter when they are read.

P-02

Checklist handover

Name one checklist per plan. A visit then records the same observations each time, which makes notes easier to compare.

P-03

Plan edits

When an interval changes, note what changed and why in the plan record so the reason stays with the device.

P-04

Repair follow-up

After a repair, add a short account and link it to the device row. The plan and the note then sit side by side.